# My Second Project

For our second example project we're going to do something a bit more complicated. Let's as an example presume we want to perform a number of Widget installations for our customers.

These installation projects will involve a number of steps, including pre-planning calls, post-installation wash-up, and of course the installation itself. We'll also add an action so we can see how these are recorded and reported on. This example will only use the status codes provided with the sample data, but you are encouraged to experiment setting up your own status codes and workflow rules.

As a first step we'll create a containing project for these installations, in this example we'll create at the root of the project tree, in practice you would probably have an existing structure in which to place. We'll use the _admin_ user to create, if another user is chosen, check that the user has permissions to create at the root level.

Go to the menu _Projects/Project Tree_ and create a new project. Call the new project/directory " _Widget Installations_", and give it a status of " **Business Area**" with a Sub-Status of " **Active**". The Sub-Status determines what the default status of any project created under this one will be, if not defined then this is inherited, which we don't want in this case. These status codes are provided with the demo data, the " **Business Area**" status code has a type of **Complete** and a display mode of **Directory**. The type **Complete** means that the project will be displayed in sub-project lists, but not scheduled, and not shown on the home page. The display type of **Directory** just lists sub-projects without any other detail. The " **Active**" status code has a type of **Active**, which is shown in all lists and scheduled, with display mode of " **Full**" which as it's name suggests displays a project with all elements visible. In reality we would create some new status codes such as " _Widget Install (Ordered)_", " _Widget Install (Planned)_", " _Widget Install (Complete)_" then link them together with workflows, possibly in different sub-folders, movement controlled by workflow rules.

One more thing we need to do is set a priority on the " _Widget Installations_" folder we have created, this has no effect on the folder itself as it's not scheduled, but it will be inherited by created sub-projects (our installations). Because the project has a type defined by its status of **Directory**, we can only see a project list - so change the default view in the console to **Full**. The console on a web browser is the optional set of controls in the upper right section of the screen, on a mobile device it is an expandable section at the top of the page. With the view set to **Full** we can see and change the priority or sub-status fields, when we've done that change the view back to default. Note that project creation dialog is slightly different for root projects, and if we had done this at a lower level we would have been able to set the priority at creation, and would have had to change the view in order to set the Sub-Status.

Ok, let's now create a widget installation, click _New_ and give the project a title of " _ACME Widget Installation_" (our favourite customer). Don't worry about any of the other values, we can populate them later, just click _Create Project_ for now. We're going to add a few things, first of all we know that _Jack Frost_ is currently available, so we're going to use him to do the installation. Go to the **Workers** tab of our new project and add _Jack Frost_ as a project member (this project will turn up in his member list). Next go to the **Resources** tab, and add the " _ACME Corporation_" under the companies section. This will associate the project with that company, allowing for search by company and also financial reporting. If we had a schematic of the installation location, we might also add to the **Documents** section at this point.

Now we're going to add a few sub-projects/tasks to this installation; a pre-planning call, the installation itself, and a post-installation call. Go to the **Tasks** tab, and add a new project called " _Pre-Planning Call_", choose a status of " **Active**". Then go back up to " _Widget Installation_" and add another project called " _Site Installation_", this one we will give a status of " **Planning**". This status schedules projects after any active ones, so we get an idea of lead time. Once we know when the installation is to take place, we can set a fixed time and/or change the status to an **Active** one. Finally create another sub-project of the installation of type **Active** with title " _Post-Installation Wash Up_".

At this point we might want to add in a few dependencies, so navigate to the Site Installation project, select the **Schedule** tab and add the pre-planning call as a pre-requisite. Also go to the wash up call and add the installation as a pre-requisite of that. If you didn't specify during task creation, let's add some time estimates on the installation tasks, for example set the two calls to " _1h_" and the site installation to " _1d_".

For this exercise let's add an action to the project; navigate to the pre-planning call. Go to the **Activity** tab, and create a new one. Select the activity _Administration_, a duration of " _10m_", and notes: " _Arranged call time with the customer, tomorrow noon_" - add the action. Now in the **Workers** tab add _Jack Frost_ as a project member, then in the **Resources** tab add a new Meeting. Call it " _ACME Pre-Installation Conference_" with the call details in the Venue section. Complete the duration and schedule fields, if we know the exact time we can enter that, or a range within which the meeting will be scheduled, subject to other conflicting committed events.

Finally, let's change the owner of the site installation project to _Jack Frost_, as he will be doing it. Have a look at the calendar and home page lists to see how these projects have affected them. During this example we've omitted to enter information such as objectives and status, and this scenario would probably benefit from using a template for the installation structure, but it can be the basis for experimentation.

### See also :-

- [Everything is a project](/content/guides/everything-is-a-project/index.html)
- [I'm ready to go live, what next ?](/content/guides/going-live/index.html)
- [How do project status types affect scheduling priority ?](/content/guides/project-status-types-and-scheduling-priority/index.html)
- [Which display mode should I select in a project status code ?](/content/guides/project-display-mode/index.html)
- [Critical path calculations explained](/content/guides/critical-path-calculations/index.html)
- [How do I create a project template ?](/content/guides/project-templates/index.html)
- [How do I restrict visibility of a project ?](/content/guides/project-security/index.html)
- [How and why should I create workflows ?](/content/guides/project-workflows/index.html)